Minutes for Meeting 12

  1. Homework 2 is due in a week. Sid will set up a page on the wiki and everyone will post their metric ideas and the tools that they have available by Monday night. Then the ideas and people will be divided into 2 groups for HW2.
  2. Status Reports:
    1. Sid - Revised the class diagrams and downloaded oracle and installed it on a windows box. This box is unavailable for use by the group, however. (postmeeting) Sobby has access to the resources to do this and will set it up.

At this point the meeting dissolved due to an IRC glitch that disconnected everyone multiple times. Sid will send email with a different server for next week.