CS 327 - FALL 2002 PROJECT WEBSITE |
Meeting 5 Minutes (4/Nov/02)
In Attendance:
Ross, (Sid by proxy), Sandra, Brian, Jianmei, Dave, and Abhay.
Sonia where are you!?
Agenda:
- Unforeseen Risk
Since Sid's neighbor threw him an unwanted house warming party
Ross was acting in Sid's behalf. Assignments for this next week
were made and the architecture was discussed.
- Architecture
The basis for the architecture will be Sid and Ross' homework
2 . Everyone needs to review it.
- Assignments (to be completed this week)
- Current iteration plan and draft for the next iteration plan:
Dave
- Continue reviewing documents and giving feedback: Everyone
- Organize existing documentation on the website: Sandra
- Finish use case list and model: Brian and Abhay
- SQL Importation Use Case/Design: Sandra and Jianmei
- Code a skeleton of the Schema Package: Dave
- Abstract Package to Handle Multiple Schema Importers: Abhay
- Organize the architecture documentation: Ross